Interconnector aka DART underground
Re: Interconnector aka DART underground
I realise it's not a short term priority but the main belfast line being re routed to Heuston does make long term sense. As a result, the Balbriggan to Kildare DART line will be completely seperated from inter city services which will offer a huge boost in capacity and having thhe Airport on an intercity line makes a whole lot more sense as people travelling from other parts of the country don't have to go near the city center. This option does offer a whole lot more then the option to run a circle line DARt service.
- cgcsb
- Senior Member
- Posts: 516
- Joined: Wed Dec 12, 2007 8:24 pm
Re: Interconnector aka DART underground
All of these plans for the stations look perfect.
I dont see any problems with any of it.
Although Spencer dock is still a puzzle for me, arent they allready building on top of where that station is. In the map i cant tell if there is a building there but its plausable that they would do it.
Also, im not one for all the historical stuff, but i can see their being problems with the high street/Christ church station, its comendable that the station entrances itself are in wood quay, but the vents and amenities at the foot of the city wall could incounter a lot of previously un-excavated archeology, after all it is the city wall.
Heuston's plan A is looking good and the provision for at least 1 terminal platform is very good planing for both versions of the plan.
Although my only concern is the use of the double tunnel's. What if one direction is blocked, that whole tunnel will be jammed and by the look of things only 1 track exists in each with no switches at the stations, who will you keep traffic flowing if you're down to 1 tunnel and only 1 track? Wouldnt a 2 tracks in each tunnel or some sort of switching procedure help alleviate such a problem if it ever occured? Even in the case of terrorism or an accident 1 tunnel could be impeded and we would only have the facilities to send trains 1 direction through the whole tunnel length? That seems dangerous. New york and London have multible switches but the main flaw of some subway's such as Glasgow's is their isolation and lack of switching. Even the Channel tunnel has a lot of crossing points due to its traffic.
I guess they have thought about such problems but a serious blockage in one tunnel could seriously slow down the network.
I dont see any problems with any of it.
Although Spencer dock is still a puzzle for me, arent they allready building on top of where that station is. In the map i cant tell if there is a building there but its plausable that they would do it.
Also, im not one for all the historical stuff, but i can see their being problems with the high street/Christ church station, its comendable that the station entrances itself are in wood quay, but the vents and amenities at the foot of the city wall could incounter a lot of previously un-excavated archeology, after all it is the city wall.
Heuston's plan A is looking good and the provision for at least 1 terminal platform is very good planing for both versions of the plan.
Although my only concern is the use of the double tunnel's. What if one direction is blocked, that whole tunnel will be jammed and by the look of things only 1 track exists in each with no switches at the stations, who will you keep traffic flowing if you're down to 1 tunnel and only 1 track? Wouldnt a 2 tracks in each tunnel or some sort of switching procedure help alleviate such a problem if it ever occured? Even in the case of terrorism or an accident 1 tunnel could be impeded and we would only have the facilities to send trains 1 direction through the whole tunnel length? That seems dangerous. New york and London have multible switches but the main flaw of some subway's such as Glasgow's is their isolation and lack of switching. Even the Channel tunnel has a lot of crossing points due to its traffic.
I guess they have thought about such problems but a serious blockage in one tunnel could seriously slow down the network.
- Denton
- Member
- Posts: 32
- Joined: Wed Sep 03, 2008 10:59 am
Re: Interconnector aka DART underground
for those of you interested this appears to be the difference between crossrail and the dart underground
- Attachments
-
- the difference between crossrail and underground.jpg (81.86 KiB) Viewed 1380 times
- missarchi
- Old Master
- Posts: 1773
- Joined: Sat Dec 08, 2007 6:53 pm
Re: Interconnector aka DART underground
Something tells me IE's tunnel is going to look much better than the RPA's train set
- SunnyDub
- Member
- Posts: 210
- Joined: Tue May 06, 2008 3:44 pm
Re: Interconnector aka DART underground
SunnyDub wrote:Something tells me IE's tunnel is going to look much better than the RPA's train set
I actually think the opposite... currently the RPA designs have much more potential than CIE thats not to say they will look better or function better... it just comes down to a third party taking control
CIE does not appear to be want to cut and cover st stephens green north or some corn market... it is tight but it is possible They are investing all the hard cash in docklands and not grand central... because the land around it has more potential
- missarchi
- Old Master
- Posts: 1773
- Joined: Sat Dec 08, 2007 6:53 pm
Re: Interconnector aka DART underground
I presume they're not going to cut and cover at docklands givent that Treasury are currently building over...and originally they had the docklands station under the river
- SunnyDub
- Member
- Posts: 210
- Joined: Tue May 06, 2008 3:44 pm
Re: Interconnector aka DART underground
I read somewhere that both future DART lines are planned to have double decker trains. I wonder can the tunnel accomidate this or will it be a case of the port tunnel i.e. the trucks for which it was intended can't fit in
- cgcsb
- Senior Member
- Posts: 516
- Joined: Wed Dec 12, 2007 8:24 pm
Re: Interconnector aka DART underground
that's just not true about the port tunnel.
- notjim
- Posts: 1708
- Joined: Tue Mar 06, 2001 12:00 am
- Location: Dublin
Re: Interconnector aka DART underground
Super trucks cannot safely fit in the Port Tunnel
- cgcsb
- Senior Member
- Posts: 516
- Joined: Wed Dec 12, 2007 8:24 pm
Re: Interconnector aka DART underground
because it was not intended to accommodate 'super trucks'.
- Peter Fitz
Re: Interconnector aka DART underground
exactly, I mean will it be intended for double decker trains to use the DART tunnel?
- cgcsb
- Senior Member
- Posts: 516
- Joined: Wed Dec 12, 2007 8:24 pm
Re: Interconnector aka DART underground
Dempsey supports cross city underground
http://www.irishtimes.com/newspaper/ireland/2009/0406/1224244068221.html
hopefully it'll happen
http://www.irishtimes.com/newspaper/ireland/2009/0406/1224244068221.html
hopefully it'll happen
- SunnyDub
- Member
- Posts: 210
- Joined: Tue May 06, 2008 3:44 pm
Re: Interconnector aka DART underground
there have been geo technical surveys being carried out in Stephen's Green for the past 2 to 3 weeks for the new DART station
- cgcsb
- Senior Member
- Posts: 516
- Joined: Wed Dec 12, 2007 8:24 pm
Re: Interconnector aka DART underground
There has been a lot of surveying done on northside of Merrion Square also in the last few weeks
- shed
- Member
- Posts: 35
- Joined: Sun Apr 01, 2007 6:43 pm
Re: Interconnector aka DART underground
Iarnród Éireann's DART underground timeline:
railway application:2009
enabling works: 2010
Construction start:2011
Completion:2015
+cost cutting measures including moving tunnel entrance to Inchicore, cutting out additional access points for underground stations and other small alterations
http://www.transport21.ie/MEDIA/Press_Releases/DART_Underground_-_Tunnel_to_be_extended_to_Inchicore.html
railway application:2009
enabling works: 2010
Construction start:2011
Completion:2015
+cost cutting measures including moving tunnel entrance to Inchicore, cutting out additional access points for underground stations and other small alterations
http://www.transport21.ie/MEDIA/Press_Releases/DART_Underground_-_Tunnel_to_be_extended_to_Inchicore.html
- cgcsb
- Senior Member
- Posts: 516
- Joined: Wed Dec 12, 2007 8:24 pm
Re: Interconnector aka DART underground
I doubt that moving the tunnel portals to Inchicore will be cheaper, but it is the sensible option. Also, a station at Inchicore is very necessary, as it's a mature dense inner suburb - the old Cherry Orchard station was not that busy, but that's because it only had an infrequent service as far as Heuston. A DART to the city centre would be a lot more attractive.
- Fergal
- Member
- Posts: 36
- Joined: Sun Sep 14, 2008 9:27 pm
Re: Interconnector aka DART underground
Sounds good...
Have CIE already tendered to consortium's? or are they taking a different approach...
one exit for st stephens green now... hmmm
o Following the decision to relocate the entrances to the Metro North/Dart Underground common concourse in Saint Stephens Green North the access strategy was re-examined and the Kildare Street Entrance removed. This will significantly reduce the impact on Saint Stephens Green during construction without compromising accessibility.
- Alignment and station location at Pearse changed
o This will ensure that there is no requirement to acquire a small number of housing units adjacent to Pearse, and avoid any impact on Merrion Square.
Inchicore/Heuston: Monday 20th April, 17.00-20.00, Hilton Hotel, Kilmainham.
Christchurch: Thursday 23rd April, 17.00-20.00, Central Hotel, Exchequer St.
Docklands: Monday 27th April, 17.00-20.00, Sean O’Casey Community Centre, St Mary’s Road, East Wall, Dublin 3.
St Stephen’s Green/Pearse: Thursday 30th April, 17.00-20.00, Alexander Hotel, Fenian St, off Merrion Square, Dublin 2.
Have CIE already tendered to consortium's? or are they taking a different approach...
one exit for st stephens green now... hmmm
o Following the decision to relocate the entrances to the Metro North/Dart Underground common concourse in Saint Stephens Green North the access strategy was re-examined and the Kildare Street Entrance removed. This will significantly reduce the impact on Saint Stephens Green during construction without compromising accessibility.
- Alignment and station location at Pearse changed
o This will ensure that there is no requirement to acquire a small number of housing units adjacent to Pearse, and avoid any impact on Merrion Square.
Inchicore/Heuston: Monday 20th April, 17.00-20.00, Hilton Hotel, Kilmainham.
Christchurch: Thursday 23rd April, 17.00-20.00, Central Hotel, Exchequer St.
Docklands: Monday 27th April, 17.00-20.00, Sean O’Casey Community Centre, St Mary’s Road, East Wall, Dublin 3.
St Stephen’s Green/Pearse: Thursday 30th April, 17.00-20.00, Alexander Hotel, Fenian St, off Merrion Square, Dublin 2.
- missarchi
- Old Master
- Posts: 1773
- Joined: Sat Dec 08, 2007 6:53 pm
Re: Interconnector aka DART underground
Story on Interconnector & Metro from yesterday's budget coverage
http://www.irishtimes.com/newspaper/finance/2009/0408/1224244216569.html
"Mr Dempsey said it had not been possible to cut the national roads capital budget as it was almost entirely assigned to road projects that were under way.
Nor did he announce cuts to the big public transport rail projects, the Dart interconnector or the Metro North, because neither requires funding, other than for planning purposes, this year.
Asked if major budget difficulties would emerge in a few years when the big projects were ready to go to construction, Mr Dempsey said the Government was looking at whether the National Treasury Management Agency could find ways of “keeping these off the balance sheetsâ€.
He cited the Dart interconnector and Metro North, which as public-private partnerships might not require funds upfront. While there might be comparatively small preliminary costs, “once the contractors move in, we don’t have any liability until it is builtâ€.
http://www.irishtimes.com/newspaper/finance/2009/0408/1224244216569.html
"Mr Dempsey said it had not been possible to cut the national roads capital budget as it was almost entirely assigned to road projects that were under way.
Nor did he announce cuts to the big public transport rail projects, the Dart interconnector or the Metro North, because neither requires funding, other than for planning purposes, this year.
Asked if major budget difficulties would emerge in a few years when the big projects were ready to go to construction, Mr Dempsey said the Government was looking at whether the National Treasury Management Agency could find ways of “keeping these off the balance sheetsâ€.
He cited the Dart interconnector and Metro North, which as public-private partnerships might not require funds upfront. While there might be comparatively small preliminary costs, “once the contractors move in, we don’t have any liability until it is builtâ€.
- SunnyDub
- Member
- Posts: 210
- Joined: Tue May 06, 2008 3:44 pm
Re: Interconnector aka DART underground
cgcsb wrote:I read somewhere that both future DART lines are planned to have double decker trains. I wonder can the tunnel accomidate this or will it be a case of the port tunnel i.e. the trucks for which it was intended can't fit in
Just wondering where you read that there may be double decker DART trains in the future?
It would be pretty cool if it's true:cool:
- EIA340600
- Member
- Posts: 86
- Joined: Tue Oct 30, 2007 7:34 pm
- Location: Dublin
Re: Interconnector aka DART underground
Just found this map of the rail network to be on.
http://www.railusers.ie/images/2005_p11railplan.jpg
It seems to be from a couple of years back which would explain the DART to airport and the stops on MN as well as the line which appears to be the phoenix park tunnel.Interesting..........
.
http://www.railusers.ie/images/2005_p11railplan.jpg
It seems to be from a couple of years back which would explain the DART to airport and the stops on MN as well as the line which appears to be the phoenix park tunnel.Interesting..........
.
- Attachments
-
- Dart.jpg (94.4 KiB) Viewed 1265 times
- EIA340600
- Member
- Posts: 86
- Joined: Tue Oct 30, 2007 7:34 pm
- Location: Dublin
Re: Interconnector aka DART underground
EIA340600 wrote:Just wondering where you read that there may be double decker DART trains in the future?
It would be pretty cool if it's true:cool:
It's been such a long time, I'm afraid I can't remember. With the plans I see now, they are clearly using single deck trains. Evidently IÉ doesn't think the double deckers are worth the hastle.
- cgcsb
- Senior Member
- Posts: 516
- Joined: Wed Dec 12, 2007 8:24 pm
Re: Interconnector aka DART underground
Nice, although it's funny that there is no DART/Commuter service to Navan on that map
- cgcsb
- Senior Member
- Posts: 516
- Joined: Wed Dec 12, 2007 8:24 pm
Re: Interconnector aka DART underground
EIA340600 wrote:Just wondering where you read that there may be double decker DART trains in the future?
It would be pretty cool if it's true:cool:
Is there enough clearance under the overhead lines? The older bridges?
-

Paul Clerkin - Old Master
- Posts: 5380
- Joined: Wed Mar 03, 1999 12:00 am
- Location: Monaghan
Re: Interconnector aka DART underground
Paul Clerkin wrote:Is there enough clearance under the overhead lines? The older bridges?
obviously not. but very difficult to anticipate such.............
- marmajam
- Member
- Posts: 247
- Joined: Tue Mar 03, 2009 6:18 am