Planning Permission vs Building Control
1 post
• Page 1 of 1
Planning Permission vs Building Control
I received planning permission for a house. This house design had a stairs with a winder in the middle. We built the house. Building Control now say it is not acceptable as winders if not avoided should be at the bottom. But I got planning permission so how can it now be wrong?. Part B (which I am now aware of) uses the word preferably in relation to not using a winder, can this become never at the stroke of a pen?
- Borough
- Member
- Posts: 2
- Joined: Tue Dec 12, 2006 7:25 pm
1 post
• Page 1 of 1
Return to Irish Planning Matters
